Doha, Qatar • Construction • Renovation • Building Maintenance
Call / WhatsApp: +974 50814060 • ampleqat@gmail.com

Villa and Majlis Renovation in Doha

We renovate older villas, majlis rooms and apartments with modern finishes, from layout changes to gypsum, lighting, tiling and painting, as one project with one contractor.

Villa and Majlis Renovation in Doha

Every villa is different. Some clients want one majlis or room refreshed, others want the whole villa renovated from the entrance to the roof. We start with a site visit to inspect the structure, electrical wiring, plumbing and finishes, then propose a scope and prepare a detailed quotation rather than guessing a number over the phone.

Because we carry out construction, finishing, electrical and plumbing works ourselves, we can manage the whole project and run each stage in the right order through to handover, so the gypsum ceiling goes up after wiring is finished, not before, and tiling happens after waterproofing has cured, not as a rushed afterthought.

Villa Renovation in The Pearl Qatar, Lusail and West Bay

A growing share of our villa and apartment renovation work is inside The Pearl Qatar's villa districts, Lusail's new residential towers and West Bay's established apartment blocks. These buildings bring their own rules on top of the renovation work itself: Pearl Qatar villa associations and building management require approved contractor access and a work schedule before any demolition starts, Lusail towers often restrict heavy work to specific hours and require lift bookings for moving materials, and West Bay buildings commonly limit noisy work (drilling, hammering) to daytime hours on weekdays. We handle this coordination as part of the project, submitting the paperwork and scheduling noisy stages around the building's rules so the renovation does not stall waiting on permissions.

What a Full Villa Renovation Covers

A full villa renovation typically starts with demolition of outdated finishes and fixtures, followed by an electrical rewiring check against current Kahramaa (Qatar General Electricity & Water Corporation) safety standards, since villas built more than 10-15 years ago often have undersized distribution boards and wiring that was never designed for today's AC load and appliances. We then address waterproofing on the roof, bathrooms, kitchen and any parapet walls before gypsum ceiling work, tiling and painting begin, because sealing moisture problems after finishes are installed means redoing the finishes later.

What the work includes

  • Full renovation of older villas, from structure to finishes
  • Majlis and reception room renovation
  • Room modification and partitions
  • Electrical rewiring to current Kahramaa standards
  • Waterproofing renewal for roofs, bathrooms and parapets
  • Gypsum ceilings, cornices and hidden lighting
  • Tile, marble and granite
  • Interior and exterior painting
  • Bathroom and kitchen renovation
  • New doors and windows

Why Ample Trading

Site visit and measurements before pricing
One team for every trade — no juggling separate contractors
Clear quotation based on the actual scope
Experience with villas, apartments and buildings across Doha, The Pearl, Lusail and West Bay
Building-management coordination for tower and compound units
Correct work sequencing: wiring, then ceilings; waterproofing, then tiling

Areas We Serve

DohaAl WakrahAl RayyanLusailAl KhorUmm SalalThe PearlWest Bay

Frequently Asked Questions

How long does a full villa renovation take in Qatar?

A full villa renovation in Qatar typically takes 6 to 12 weeks depending on the villa's size, how much structural and layout work is needed, and whether the family is living in the villa during the works. A single majlis or room refresh is usually completed in 1 to 3 weeks. We confirm the exact timeline after the site visit and measurement.

Can you renovate the villa while we are still living in it?

Yes. Many villa renovations in Doha are done in phases, one wing or floor at a time, so the family can keep living in the rest of the villa. We sequence electrical, plumbing and finishing work by zone and seal off work areas to limit dust and disruption to occupied rooms.

Do you handle the majlis separately from the rest of the villa?

Yes, a majlis-only renovation is one of our most common requests, especially before Ramadan, weddings or family gatherings. We can renovate just the majlis and entrance area, including gypsum ceiling, lighting, flooring and seating-area finishes, without touching the rest of the villa.

What is usually wrong with an older villa in Qatar before renovation?

Older villas in Qatar most commonly need updated electrical wiring and distribution boards to current Kahramaa standards, waterproofing renewal on roofs, bathrooms and parapets, repair of cracked or hollow tiles, and gypsum ceiling and cornice repair where water damage or age has caused sagging or staining.

Do you renovate villas in The Pearl, Lusail and West Bay towers, or only standalone villas?

Both. For standalone villas in areas like Al Wakrah, Al Rayyan and Umm Salal we manage the full site directly. For units inside The Pearl, Lusail and West Bay towers we additionally coordinate with building management for work permits, lift booking and approved working hours, since these buildings have stricter access and noise rules than standalone villas.

What is included in a villa renovation quotation?

A villa renovation quotation covers labour and materials for the agreed scope, such as demolition, electrical rewiring, plumbing, waterproofing, gypsum ceilings, tiling, painting and fixtures, based on measurements and the condition assessment from the site visit, so the price reflects the real scope rather than a rough estimate.

Helpful guides

CallWhatsAppSite Visit